Skip to content
MADE TO ORDER, NO STOCK — HANDMADE IN İZMİR — WORLDWIDE SHIPPING FROM TÜRKİYE — TRADE PROGRAM OPEN — 12 WEEK LEAD TIME ON CUSTOM MOULDS
KOLAYFIBER

THE ATELIER

Where the mould is the design

A fiberglass piece is made twice: once as a plug and mould, once as the object. The first is the real design work.

Forms are modelled digitally, milled or hand-shaped as a plug, then faired until the reflection runs clean. Laminates are laid by hand for wall thickness where load asks for it. Everything after that is patience — filling, fairing, priming, blocking, painting, polishing. Nine people, one surface.

Contact
CUSTOM COMMISSION — PRIVATE CLIENT
CUSTOM COMMISSION — PRIVATE CLIENT

FROM THE ATELIER FLOOR

01 · CUSTOM FORM DEVELOPMENT
01 · CUSTOM FORM DEVELOPMENT
02 · STONE-EFFECT TRIAL
02 · STONE-EFFECT TRIAL
03 · MATTE SATIN FINISH
03 · MATTE SATIN FINISH
04 · CANTILEVER TEST
04 · CANTILEVER TEST
05 · PANEL MOULD PULL
05 · PANEL MOULD PULL
06 · BEFORE DISPATCH
06 · BEFORE DISPATCH

HANDMADE, START TO FINISH

Nine pairs of hands. No production line.

The mould fixes the form; people make the piece. Every shell is laid up, trimmed, faired and polished by hand in our İzmir atelier — which is why the surface is seamless, and why lead time is weeks, not days.

HAND-SHAPED

Plugs shaped and faired by hand until reflections run straight.

STAGE 02
HAND-LAID

Laminate laid by hand, layer by layer, thickness mapped to load.

STAGE 04
HAND-FAIRED

Filled and block-sanded by hand — the longest stage.

STAGE 06
HAND-POLISHED

Cut and polished by hand in four stages to the final finish.

STAGE 07
01 Form Digital modelling, silhouette tests, 1:5 study prints.
02BY HAND Plug Milled or hand-shaped master, faired until reflections run straight.
03 Mould Split tooling with flanges planned around the parting line.
04BY HAND Lay-up Hand-laid laminate, thickness mapped to load paths.
05 Demould Release, trim, bond internal ribs and fixing bosses.
06BY HAND Fairing Fill, block-sand, prime, repeat. The longest stage.
07BY HAND Finish Pigmented coat to house colour or RAL, then polish.
08 Crate Foam-cradled, edge-protected, plywood crate, photographed.
4.5 m MAX SINGLE-PULL LENGTH
12 wk NEW MOULD TO FIRST PIECE
RAL FULL COLOUR MATCHING
40+ COUNTRIES SHIPPED